亚洲精品成人av观看-亚洲中文字幕在线第六区-国产三级久久久精品麻豆三级-精品无码久久久久久久久水蜜桃-国产福利视频在线观看

新聞動態
以雄厚的生產實力和優良的售后服務贏得了客戶的信任和贊譽

Installation steps and cooling effect of radiator

作者:Tianli biology點擊:439
When determining the layout of the radiator, the convection of the indoor hot and cold air should be considered, and the radiator should be close to the entrance of the cold air as far as possible to improve the uniformity of the room temperature distribution. If a room needs more radiators, it is better to install them in groups. If too many column radiators are combined together, their heat dissipation effect will be affected. If the number of assembled chips is compared with this standard group, when each group is less than 6 chips, the heat dissipation of each chip will increase by 5%, while when each group is 11-20 chips, the heat dissipation of each chip will decrease by 5%.
The tandem radiator is easy to be installed separately, and when it is overlapped up and down, the heat dissipation is also reduced. The inlet and outlet pipes should not be set on the same side of the radiator. When installing, the inlet pipe should be slightly raised to facilitate the exhaust.
Installation procedure of radiator
1. Slot the floor or wall. In order to bury the exposed pipeline, the construction team must make a groove on the wall and ground. The depth or width of the groove needs special installation personnel to collect the actual treatment.
2. Lay pipeline and protect card slot. According to the location of the radiator in the early stage, the branch pipe can be slotted and laid. According to the customer's demand, the steel groove can be laid in the branch pipe to protect the pipeline, and the system can be closed and water injected to pressurize.
3. Install the water distributor. The diversity water collector is a water flow distribution and collection device which is composed of a water distributor and a water collector. The water separator should be installed horizontally and cleaned after installation.
4. Pressure test the radiator system. This is a very important step in the radiator installation steps. The specific operation is as follows: close the main pipe connection valve, open the radiator inlet valve, and use the pressure test equipment to test. The test pressure should be 1.5 times of the normal use pressure, and not less than the test pressure of the whole community pipe network. It is qualified if there is no leakage for 3-5 minutes.
5. According to the decoration schedule. Radiator construction and hydropower construction are carried out simultaneously, so as not to affect the construction progress.
6. Install the radiator. Place the radiator stably, connect the valve connector with the inlet and outlet valves, use a level ruler to measure whether the radiator is straight and whether the pipeline installation meets the requirements, and then use a pipe clamp to tighten the connector.
7. The customer checks and accepts the whole radiator system. Usually, when replacing the construction, the workers will reserve the valve on the pipeline. After the installation, the stamping test should be carried out to prove that there is no running, dripping, leaking place before the acceptance can be completed.
8. The radiator system is installed. The whole radiator installation steps are completed, users can smoothly enter the use stage.

主站蜘蛛池模板: 国产做a爱免费视频在线观看| 国产欧美视频综合二区| 日韩欧美一区二区国产| 少妇人妻系列无码专区视频| 亚洲欧洲av综合色无码| 老头边吃奶边弄进去呻吟| 99精品视频九九精品视频 | 国产精品一区二区的区四区综合| 亚洲精品一区在线| 少妇被粗大的猛烈进出视频| 亚洲欧美日本国产专区一区 | 狠狠五月深爱婷婷网| 精品一区二区三区香蕉| 无码免费的毛片基地| 国产成人午夜无码电影在线观看| 中国熟妇人妻xxxxx| 精品一区二区欧洲在线观看| 综合在线 亚洲 成人 欧美| 国产成人久久综合77777| 国产免费啪嗒啪嗒视频看看| 日本边添边摸边做边爱| 中文字幕欧洲有码无码| 日产欧美国产日韩精品| 又大又黄又粗高潮免费| 欧美在线亚洲一区| 亚洲欧美国产欧美色欲| 18禁无遮挡免费视频网站| 强 暴 疼 哭 处 女 身子视频| 午夜亚洲中文字幕一区二区三| 亚洲成a人片在线观看天堂| 人妻出轨av中文字幕| 亚洲精品天堂成人片av在线播放| 精品久久久久中文字幕app| 国产午夜精品一区二区三区不| 成年片色大黄全免费软件到| 丰满日韩放荡少妇无码视频| 亚洲熟女乱色综合一区小说| 五月久久久综合一区二区小说| 猫咪av成人永久网站在线观看| 69成人免费视频无码专区| 玩弄少妇秘书人妻系列|